Construction observation on commercial reroofs in Oklahoma by an IIBEC Registered Roof Observer (RRO). I’m on the roof while the work goes in. I represent the owner and hold the spec against the work, with a photo and a time on everything I write down.

IIBEC Registered Roof Observer badge

IIBEC Registered Roof Observer

Registered to observe roof installs and hold the work to the spec.

Three corners, folded by hand.

I was walking a reroof as the observer. Three of the corners had been folded by hand instead of detailed. Would it work? Probably. It’s old school. The detail called for a prefabricated corner at every one.

At 8:48 that morning I told the roofer about the corners, and that they might come up at the final inspection. He heard it while the crew was still on the roof finishing details.

The corners went into the report as an open item, photos attached. The owner’s side and the manufacturer decide whether the fold stands. My part is making sure the call gets made.

A deviation found after the crew leaves turns into a return trip and an argument.

What gets observed

Each line is checked against the scope of work, the details, the manufacturer’s requirements and accepted practice.

Site and protection

Material storage, dry-in at day’s end, protection of the building.

Tear-off and deck

Deck condition, and wet or damaged decking quantified.

Insulation and coverboard

Type, thickness and layers against the scope. Attachment pattern. Staggered joints.

Membrane

The product on the label, adhesive coverage, laps and seam welds.

Flashing and details

Base flashing height, penetrations, termination bar, edge metal and coping.

Wood blocking

Fire-treated, set to the right height and fastened.

Mechanical

Units raised where required, pipes flashed, other trades coordinated.

Drainage

Slope, crickets, low spots and the water’s path to the drains.

A gloved hand holding a tube of polyurethane sealant at a wall joint

Sealant checked against the spec as it went in.

Coated base flashing running along a wall of covered windows on a white roof

Base flashing along the wall, with the windows still protected.

New coping metal capping the parapet at a roof corner

New coping metal at every edge.

A report every day the crew works.

The daily observation report is facts and numbers. I record what was communicated, to whom and when. I observe reroofs for schools, municipalities and other public owners, and the role is the same on every one: observation and reporting. Project management and direction to the crew stay with the owner’s side and the design authority.

  • Time on site, weather, crew and other trades
  • The area worked and what got installed, with running quantities
  • Every deviation: where it is, what document it misses, who was told and when
  • Open items carried report to report until they close
  • Photos captioned with the point, plus a closeout report on what was actually installed

Your warranty depends on how the roof went in.

An installation defect documented in year one is a conversation with the manufacturer. Found in year eight, it’s the owner’s problem. An observed install means the file already exists.

Warranty service

Fee

Percentage of project value

Quoted by scope, usually alongside bid management. Billed to you directly or carried in the project cost, and you’ll know which before the job starts.

Repair and reroof coordination

Common questions

What does a Registered Roof Observer do?

An IIBEC Registered Roof Observer (RRO) watches the roof go in and documents whether the work matches the scope, the details and the manufacturer's requirements. Every deviation goes in the daily observation report with where it is, what it misses and who was told.

Do I need one on a public project?

It depends on the owner and the spec. Some public owners write third-party observation into the project requirements, and when they do, the spec says so. When it isn't required, the install is still the cheapest time to catch a problem, while the crew is on the roof.

What do I get each day?

A daily observation report for every day the crew works: time on site, weather, crew and other trades, the area worked with running quantities, every deviation and who was told, plus captioned photos. Open items carry from report to report until they close, and a closeout report covers what was installed.

Do you manage the project?

No. The job is observation and reporting. Direction to the crew comes from the owner's side and the design authority.

The spec is the promise.